Deep Well · Clean Water Mission Website Template · sample contentOpen editorGet this website
Skip to content
Deep Well
HomeWellsThe yardDrill tripsGiveWho we are
Deep Well
Deep Well
HomeWellsThe yardDrill tripsGiveWho we are

4810 E 50th St, Lubbock, TX 79404

(555) 014-3380

yard@example.org

Fund a repair
Children gathering water from a hand pump

Wells pumping · Karamoja and Teso, Uganda

412

wells pumping water at their last inspection

We have drilled or rebuilt 438 wells since 2003. Our Ugandan mechanics visit every one of them twice a year, and when one breaks they are usually there within a week.

under repair this month
26
people within a 15-minute walk
171,000
Ugandan drillers and mechanics on staff
54
Fund a repair See every well

Inspection round closed September 30, 2026

Why we count this way

A broken pump is worse than no pump at all

Across East Africa, roughly one hand pump in three stops working within a few years of being installed. The village has been told it has water. The donor has a photo. The women walk back to the river.

Clyde Wofford spent forty years on Permian Basin rigs and saw the same thing happen on his first trip to Moroto in 2003. So Deep Well was built backwards: mechanics first, spare parts second, new drilling only when we can promise to maintain what we drill.

How a well stays working

Every well has a committee that collects about 1,000 shillings a month per household for parts. We match it.

How it works

What happens when a pump breaks

The average repair takes six days from the phone call to water.

Fund a repair
  1. 1

    Step 1: The committee calls

    Every well has a printed number painted on the stand. The water committee chair calls our Moroto office.

  2. 2

    Step 2: A mechanic drives out

    One of 31 motorbike mechanics, each covering about fourteen wells, diagnoses it on site.

  3. 3

    Step 3: Parts from the store

    Rods, cylinders and seals come from our Moroto parts store, stocked from the Lubbock yard by sea container.

  4. 4

    Step 4: Water again

    The mechanic logs the repair, the committee signs, and the record goes up on the well list.

Year on year

Fewer new wells, more working ones

We drilled less this year on purpose and put the money into mechanics.

Fiscal years ending June 30

Measure2024–252025–26Change
Wells pumping at last inspection371412+11%
New boreholes drilled2214−36%
Repairs completed214268+25%
Average days from call to water116−45%
Ugandan staff4354+26%

Inspection data from our mechanics' logs, checked by an independent auditor from Kampala each February.

Two men working at a glass furnace in a workshop

The Lubbock yard

Four acres off East 50th Street

Every pump rod, cylinder and drill bit that goes to Uganda passes through a fenced yard in East Lubbock. Retired drillers, welders and a lot of church youth groups sort, test, paint and pack it.

Twice a year we fill a forty-foot sea container. It takes about eleven weeks to reach Moroto by way of Mombasa.

  • Saturday yard day, 8 AM to noon
  • Bring work gloves; we have the rest
  • Ages 12 and up with a parent
  • Lunch from Abuelita's on the last Saturday
Bring tools to the yard
Nakiru Lomongin

At the pump

Before, when the pump broke we waited one year. Now I call Peter and he is here on Thursday. The women do not go back to the river.
Nakiru LomonginWater committee chair, Nadunget

$85 keeps one well pumping for a year

That pays for two inspections, seals and the mechanic's fuel.

Fund a repair Or bring tools to the yard
Deep Well

A well is only as good as the last time it pumped. We count the ones still working.

Pages

  • Home
  • Wells
  • The yard
  • Drill trips
  • Give
  • Who we are

The yard

  • 4810 E 50th St, Lubbock, TX 79404
  • (555) 014-3380
  • yard@example.org
  • Tue–Fri 8 AM – 2 PM
  • Saturday yard day 8 AM – Noon
© 2026 Deep Well PartnersWebsite by Greater Purpose Web

Design notes

Why Deep Well looks the way it does

Most water charities count wells drilled. Deep Well Partners counts wells still pumping, because a third of hand pumps across East Africa break within a few years. The site is built around that one honest number and the unglamorous work that keeps it high: mechanics, spare parts and a tool yard in East Lubbock.

Built for
West Texas churches and oilfield families, retired drillers and tradespeople, and donors who want proof that their well still works.
Navigation
Slim icon rail. A narrow fixed rail with a vertical wordmark leaves the full width for photography and type.
Pages
Home, Wells, The yard, Drill trips, Give, Who we are
Hero
One impact number is the hero (for example meals served this year), with a line naming the unit, a sentence of context, a row of three supporting figures and one photograph. The number counts up once when it first comes into view. Variants: a = the number spans the full width above the photo and figures; b = photo on the left, number and a ledger of figures on the right; c = the number sits on a coloured panel that overlaps the bottom of a wide photograph

Typography

Chivo at 800 weight is set tight and large, like lettering stencilled on a rig. Newsreader carries the body copy so the long explanations read like a careful report rather than a brochure. JetBrains Mono sets every well ID, depth and yield, so the numbers look like they came off an inspection sheet, which they did.

Color

Two colors from the work itself: deep well-water blue and the safety yellow painted on every rig and pump stand. The neutrals lean cool, the color of caliche dust on a Lubbock pickup. In dark mode the blue lifts toward clear water and the yellow is kept for small signals only.

Layout and navigation

The icon rail stays put on the left so a donor can jump to the well list or the yard at any point. It suits a site with six clear destinations and lots of tables, where a top bar would compete with the data.

The hero

The hero leads with 412: the wells that pumped water at their last inspection. The yellow panel overlaps the photo the way a tag is wired to a pump handle. The supporting figures admit the 26 under repair, because honesty about broken wells is the whole point.

Calls to action

The main action is Fund a repair, not Build a well, because repairs are what this ministry actually needs most. Secondary actions are physical and local: Bring tools to the yard, Apply for a drill trip.

Photography

Water at the pump, people carrying jerrycans, children drinking. We avoid close-up pity shots and use the yard's own volunteers for the Lubbock pages.

Accessibility

Square buttons with thick outlines are easy targets for older hands. The live tables are real tables with headers, and the yellow is never used for text on the light background.

Type system

  • DisplayChivoA blunt, heavy grotesque with the plainness of stencilled lettering on a rig mast or a pump housing.
  • TextNewsreaderA sturdy text serif that reads like a well-kept field report beside the heavy headlines.
  • AccentJetBrains MonoWell IDs, depths and yields set like an inspection log.

Colour and contrast

Every text pairing is checked against WCAG 2.2 in both themes.

Light theme

PairingSampleRatioWCAG
Body text on pageAa14.59:1AAA
Body text on cardsAa16.12:1AAA
Secondary textAa5.9:1AA
LinksAa6.18:1AA
Button textAa7.21:1AAA
Accent label textAa9.39:1AAA
Text on dark bandsAa14.59:1AAA
Muted text on dark bandsAa7.74:1AAA
Text on brand bandsAa7.21:1AAA
Muted text on brand bandsAa4.81:1AA

Dark theme

PairingSampleRatioWCAG
Body text on pageAa15.54:1AAA
Body text on cardsAa13.87:1AAA
Secondary textAa6.82:1AA
LinksAa8.01:1AAA
Button textAa8.11:1AAA
Accent label textAa11.54:1AAA
Text on dark bandsAa16.4:1AAA
Muted text on dark bandsAa8.23:1AAA
Text on brand bandsAa8.11:1AAA
Muted text on brand bandsAa5.1:1AA

Designed by Greater Purpose Web. Names, people and events are sample content.